Perform the following steps:

  • According to the Lab Layout Reference Diagram, determine and apply the initial switch configuration on the NYACCESS1 and NYCORE1 switches.
  • According to the Lab Layout Reference Diagram, determine and apply the initial router configuration on the NYEDGE1 and NYEDGE2 routers.
  • According to the Lab Layout Reference Diagram, determine and apply the VLANs and Trunk configurations to meet the following requirements:
  • On NYACCESS:
  • Create VLAN16  – Named Engineering
  • Create VLAN17- Named Marketing
  • Create VLAN18 – Named Sales
  • Configure Fa0/1 as a member of VLAN16
  • Create SVI VLAN17withIP Address 192.168.17.10/24
  • On NYCORE1:
  • Create VLAN16  – Named Engineering
  • Create VLAN17- Named Marketing
  • Create VLAN18 – Named Sales
  • Create trunk links between NYACCESS1 and NYCORE1 for VLANs 16 – 18
  • Create a trunk link between NYCORE1 and NYEDGE1 for VLANs 16 – 18
  • According to the Lab Layout Reference Diagram, determine and apply the configuration necessary to implement inter-VLAN routing with router on a stick on NYEDGE1 for VLANs 16 – 18.
  • Configure a default route on NYEDGE1 to 192.168.254.2.
  • Configure a static route on NYEDGE2 for 192.168.16.0/24 to NYEDGE1
  • Verify all configurations.

 